请调整浏览器窗口大小或者请使用手机查看!
The pressure is on to export three offshore wind towers to safeguard a Scottish town's economic future. And, a 130-tonne locomotive is winched onto a narrow trailer.
A naval architect must move a £3 billion aircraft carrier from a dry dock. And, it's a tight squeeze shifting 300 tonnes of steel cable under a low bridge.
In Teeside, 75,000 tonnes of coal from the US must be unloaded in just three days. And, a new £15-million yacht must be lifted to a cargo ship bound for Greece.