请调整浏览器窗口大小或者请使用手机查看!
It's a race against time as six massive container cranes have to be loaded in three days. And, a ferry is in urgent need of repair.
Massive machines are brought in to move a raised dual carriage way. Plus, a team race against time to underload a shipment of timber.
Rotor/Super Cars/Fertilizer Ship. Craig has 48 hours to get four super cars to Spain. And, rain threatens to ruin an incoming shipment of fertiliser worth up to £45,000,000.