请调整浏览器窗口大小或者请使用手机查看!
The Hills work on their first floor framing, but work slows to a stop when their tools begin to freeze. The Owens work on installing the second story gables, while Jackie and her team work to finish the cabin's roof structure.
The Hills race to finish installing their floor to avoid a delivery delay, which leads to an on-site injury. Meanwhile, Jackie and her team run into problems when their build materials start to fall apart, while the Owens struggle to install flooring before possibly being buried by a snowstorm.
The Owens work to finish the roof, but multiple falling objects and whiteout conditions make the job perilous. Jackie and her team struggle lifting the 250-pound stove from the bay up to the cabin, and The Hills arrive at their build site to find their materials buried under the snow.