请调整浏览器窗口大小或者请使用手机查看!
The loading of wind turbine sections threatens to capsize a ship. Plus, 3,000 bales of compacted rubbish are shipped to Sweden.
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.