请调整浏览器窗口大小或者请使用手机查看!
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.
In Miami, there are just two days to unload six container cranes. Plus, Martin has to check and store 1,200 metres of mooring ropes.
The loading of wind turbine sections threatens to capsize a ship. Plus, 3,000 bales of compacted rubbish are shipped to Sweden.