请调整浏览器窗口大小或者请使用手机查看!
In Miami, there are just two days to unload six container cranes. Plus, Martin has to check and store 1,200 metres of mooring ropes.
A 23,000 tonne oil rig needs offloading in Melbourne. Plus, a driver battles bad weather to deliver Christmas trees.
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.