请调整浏览器窗口大小或者请使用手机查看!
In this episode, a block wall is constructed to accept the framing of the addition. The old floor joists are shimmed to make a smooth transition to the new part of the house, and the kitchen designer lays out the kitchen.
A Flitch beam is installed on the house. Tree maintenance is performed, and a new footing is poured under the kitchen chimney. Then, the crew explores different heating systems. Kevin tours a high-tech sheathing factory in Georgia.
A bay window is removed and reframed for a new one. An old school is being restored into apartments for veterans. The underside of a deck is the "roof" of the living space below. Pipe locations are discussed.