请调整浏览器窗口大小或者请使用手机查看!
A bay window is removed and reframed for a new one. An old school is being restored into apartments for veterans. The underside of a deck is the "roof" of the living space below. Pipe locations are discussed.
In this episode, a block wall is constructed to accept the framing of the addition. The old floor joists are shimmed to make a smooth transition to the new part of the house, and the kitchen designer lays out the kitchen.
We witness an exterior wall framed on the ground and raised into place. The crew learns about the history of framing tools and talks about recessed lighting and electrical panels. Then, three laminated veneer lumber beams replace an old ridge beam.